
New TopShim run:

version = topshim 2.2.0
date = 2024-03-28
time = 13:04:20.055
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0737
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration 2: FWHM Before= 0.3 Hz, Target= 0.4 Hz, After= 0.8 Hz
Iteration 3: FWHM Before= 0.8 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration 4: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration 5: FWHM Before= 0.4 Hz, Target= 0.7 Hz, After= 0.8 Hz
Iteration 6: FWHM Before= 0.8 Hz, Target= 0.5 Hz, After= 0.8 Hz
Slow convergence detected. Shimming was aborted.
Using the best result as the final shim state.

Lineshape quality factor (1D shimming, non-spinning) = 0.706

shim changes: 
Z	-111
Z2	-56
Z3	-97
Z4	+202
Z5	+267
Z6	-702
Z7	-1348
Z8	-811

duration = 3 min 22 sec
completed successfully
finished Thu Mar 28 13:07:39 2024


========================================================================
